side

Installation
An overview of the installation process:

Step 1 The pool layout is carefully marked.
Step 2 The dig begins.
Step 3 The hole is carefully prepared to achieve proper shape and depth.
Step 4 Now that the perimeters are correct, the pool is ready to be set in place.
Step 5 The process of filling and backfilling the pool begins.
Step 6 The proper plumbing and electrical equipment is installed.
Step 7 The concrete is poured around the pool and its foundation.
Your finished pool!

© 2005 Horizon Fiberglass Pools